Work has already begun to prepare the Blundell Park playing surface for the 2019/20 campaign.
With around two months to prepare the surface until it will be required for pre-season, there has been no delay from the ground staff and Fineturf as they ready the pitch.
Work has started to level the goal-mouths, which involves drilling away concrete which is said to have been laid in Victorian times.
The pitch will then be seeded using 100% ryegrass x 4, top rated cultivars on the S.T.R.I. list.